AT A GLANCE: DSA Delivers State-0f-the-Art Data Center in Former Airforce Command and Control Center

OVERVIEW
With the time frame rapidly closing to deliver the first phase of a three-phase, 42,000 SQ FT, 6MW data center project, DSA was called in to help master plan the project and provide Design-Build services for the initial 10,700 SQ FT, 1.5MW, raised floor data center with redundant critical power in a concurrently maintainable configuration.

CRITICAL EQUIPMENT

  • 2 x 750 kW UPS systems
  • 5 x 440kW Roof Top Units with thermal wheel technology and free cooling
  • 2 x 2.5MW 13.2kV standby generators
  • 13.2kV utility and generator switchgear
  • 2 x 3MVA Unit substations
  • 20 x 300kVA Power Distribution Units
  • 20 x) Static Transfer Switches
  • 5 x 600A Automatic Transfer switches
  • EPO System
  • HI Fog fire suppression system

SERVICES PROVIDED

  • Design & Engineering
  • Construction & Project Management
  • Data Center Equipment
  • Startup & Commissioning